COMPLETED PROJECTS

Ryder Court - Mayfair - Value £2,900,000

This 18 Month project was completed in January 2017. We carried out a full mechanical services refurbishment of this 6 storey office building with roof top and basement plant rooms. Works included full landlords main infrastructure replacement and tenant CAT B fit out n office floors. Landlords systems included - various AHU plant and ductwork systems, LTHW heating and chilled water cooling plant and distribution systems, public hear services, toilets fit outs on each floor. Tennant CAT B office floor fit outs included - 4 Pipe fan coil heating and cooling systems , primary ventilation systems, control systems, kitchenette area services. This project was kept live and operation at all times.

Cosham High Street - Value £307,000

This 12 month project consist 2 high rise blocks containing a total of 46 Social apartments. We carried out the full design, drawings and calculations for all the mechanical services including boosted cold water, domestic hot water services, LPHW heating, dry risers, sanitary ware and brassware. In the design we included both external and internal gas risers to accommodate the gas supply for each individual apartment.

St Johns Church - Egham - Value £334,000

We were employed by a prestigious contractor to carry out the supply and installation of the mechanical and plumbing services. This project involved many different services with co-ordination vital to the successful completion. This success of this project was achieved when we designed a bespoke air handling unit with supply and extract kitchen fans to very tight planning conditions.  

The following services were installed by ADM

  • Mains cold water
  • Boosted cold water
  • Hot water service flow and return
  • LPHW heating
  • Underfloor heating
  • Kitchen ventilation
  • General ventilation via AHU
  • WC extract ventilation
  • Plant room installation
  • Gas installation including gas proving to kitchen
  • Air conditioning

STEM Building – Brockenhurst -  Value - 553,000

This project achieved a very good rating under the BREEAM scheme. Mechanical services that were installed include natural ventilation systems, acoustic transfer ducts, radiant panels, high efficiency boilers, hot water generatingplant and toilet accommodation.  AD Mechanical undertook the full design, Thermal Modeling, L2A BRUKL & EPC on this project.